Rig #33

Rig location on map is approximate and not to be used for navigation

Rig Information

Status Drilling
Horsepower Rating
1 500 HP
Well Name Coral Creek Unit MC44-9SH
Well Number 62
Drilling For Denbury Resources
Location Fallon, MT
PLSS Location Sec 9 T6N R60E

Directions

FROM THE 4 WAY STOP IN
BAKER MT TAKE HWY 12 EAST
FOR 1.2 MILES TRUN SOUTH
ON CORAL CREEK ROAD FOR
6.3 MILES TRUN RIGHT ON
LAND FILL SPUR FOR .5 MILES
TO LOCATION

Rig Equipment

 

  • PREP 1500hp AC Electric Drawworks with Hydraulic disk brakes and a 336WCB2 Wichita auxiliary brake.

     

    142’ x 25’ DSII Cantilever Derrick with 26’ substructure rated @ 800,000# hook load with a 400,000# set back.  22’ 9” under the rotary beams.

     

    NOV 500-ton TDS-11SA Top Drive System

     

    DSI 300-Ton walking system

     

    2 – MP 1600hp Weatherford triplex mud pumps rated f/7500 psi

     

    27-1/2” Continental Emsco Independent drive Rotary Table

     

    Can-Rig PC-300 Hydraulic Catwalk

     

    BOPs - 11" 5,000 lb Double and Annular

     

    4 – 910kw 600V AC Generators and VFD house

     

    Vapor Proof Lighting System

     

    3 – Steel Mud Tanks: 50’ x 10’ x 9’ 6”, 1450 Bbl. System

     

    2 – Brandt King Cobra Shale Shakers

     

    Brandt 2 Cone Desander

     

    Brandt 16 Cone Desilter

     

    19,000’ 5” Grade S-135, 19.5# Drill Pipe with 4 ½” IF Connections

     

    40-5” Heavy Weight Drill Pipe with 4 ½” IF Connections

     

    2 – 8” OD x 3” ID x 30’ long Drill Collars with 6-5/8” Regular connections

     

    12 – 6-1/4” OD x 2-1/2” ID Drill Collars with 4 ½” IF Connections

     

    500 Bbl. Water Tank

     

    175 Hp Boiler

     

    Skid Mounted Pushers Quarters